Queries On Goods Receipt Note

A GRN is used for which purpose?

krishna
Jan 19, 20261 min read 1

1.Confirm quantity received

2.Verify quality and condition of goods

3.Record actual receipt date

4.Update inventory stock

5.Serve as proof for invoice matching

what is GRN?

tyasuite
Jan 19, 20261 min read 1

GRN (Goods Receipt Note) is a document created when goods are received from a vendor to confirm that the material has been delivered as per the Purchase Order (PO).

How do you search for the PO number based on the product in the add IRN page?

Amit Barnwal
Nov 16, 20231 min read 19

Ans. Go to the Add IRN page. Click on the filter icon. Select the product from the dropdown of the product filter and click the filter button. It will display all the POs which include the selected products.

Q. How can we reject/cancel/edit the approved GRN in TYA?

Amit Barnwal
Aug 18, 20231 min read 22

Ans. There is no such functionality in our TYASuite currently. We follow as shown below: -

      1. Once GRN is done, we can't cancel/Reject it.

      2. We can't edit it, once GRN is approved.

Whether Quality Check report or Inspection report can be attached during approval of GRN/QC?

Saurabh
Oct 26, 20221 min read

Yes, there is a provision for attaching a supporting document during the approval of the quality check (QC), On Add QC Page user can attach the Quality Check report or Inspection report.

Which details need to be enter to save the Add QC page ?

Saurabh
Oct 26, 20221 min read

In Add, the QC Page user needs to enter the accepted quantity, rejected quantity and rejection reason against the GRN. If a user wants to attach the Inspection/QC Report or image of rejected quantity then the same can be attached to the QC page.

How to set different approver name for one location/department and another approver name for another location/department?

Saurabh
Oct 26, 20221 min read 60

There is an option in the system, to set the approver name based on the cost centre (Location or Department) wise. Users can set an approver name for one location/department and another approver name for another location/department in the “Set Approval Limit” menu page. There is a ‘MAP’ button (Green Colour) available in front of each cost centre. To set the approver’s name or change an approver's name user needs to click on the ‘MAP’ button and then click on the ‘Add New’ button from where the user can set the amount based on a different approver name.

How many approvers can be set for GRN/QC module?

Saurabh
Oct 26, 20221 min read

A minimum zero approver can be set for GRN/QC Approver and a maximum of Ten approvers can be set.

How to change the approver name for the QC/GRN module?

Saurabh
Oct 26, 20221 min read 62

Under the “Mapping” menu open the “Set Approval Limit” menu page. In the “Set Approval Limit” page, select ‘IRN Data’ from the dropdown list of ‘Filter by Module’, list of all cost centres will come, user can set the approver name or change the approver for each cost centre separately by clicking on ‘MAP’ button.

How to set approver GRN/ Quality Check in the system?

Saurabh
Oct 26, 20221 min read 41

The approver of GRN i.e. QC can be set from the “Set Approval Limit” menu available under the “Mapping” menu. Open the “Set Approval Limit” page and select IRN Data from the dropdown of ‘Filter by Module’. A list of all the cost centre will come, approver name has to set against each cost centres separately. Approver can be set from zero to ten number of approvals.

Talk to us

Speak to us!

We are just a call away! Share your thoughts
Got a question

Puzzled! Ask Something?

We are ready to answer your queries
Ask Query

Still Confused in Selecting the Best!

Our experts are here to help you