Queries On Purchase Order

Q. Project and Task are not visible after selecting the cost center while Raising Direct PO?

Amit Barnwal
Aug 18, 20231 min read 21

Ans. Kindly assign/ map the correct project and Task with the particular Cost Center to proceed further.

If PO is closed for the pending quantity, can the user re-raise the Closed PO?

Amit Barnwal
Jul 17, 20231 min read 16

Ans No, once PO gets closed, then there is no option to raise the closed PO.

What can be done if “Incorrect GST for PO No. in 2nd Line item” has been marked and PO has been approved?

Amit Barnwal
Jul 15, 20231 min read 20

  1. In that case, “Modify PO” is the functionality through which we can do any changes to HSN Code.
  2. Go to the search dropdown of the Menu bar. Search “Modify PO”. Filter the required PO No. Do the required changes in the HSN code for GST.
  3. Once changes are updated, it will go for approval.

How to enable the field “Send Mail To Vendor” in “Raise PO”?

Amit Barnwal
Jul 12, 20231 min read 14

A. Go to Company Setup. Go to the PO tab. Then Click on the edit option on the top right corner of the screen and search for the option Send Mail To Vendor”. Enable it.

B. Once enabled, this option will be visible in the “Raise PO” screen and you can select this checkbox to send a PO PDF mail to the specified Vendor.

What is the functionality of “Send Mail To Vendor” in “Raise PO”?

Amit Barnwal
Jul 12, 20231 min read 8

A. This option Send Mail To Vendoris added in “Raise PO” which is to be checked while raising PO.  So, when PO is raised and approved then an approved PO PDF is sent to a specified Vendor specifying the Purchase Order No. along with the products.

B. If this field is not checked then no PO PDF Mail will be sent to the specified Vendor.

What happens If a user wants to edit the product description while raising a PO?

Amit Barnwal
Jul 10, 20231 min read 8

  1. Go to Company Setup. Go to PO Tab. Click on the edit option in the top right corner of the screen and search for the option “While Raising A PO Product Description Editable?”.
  2. Enable it. Thus, the user can edit the product description while raising a PO.

How to enable the functionality of GST% in PO PDF?

Amit Barnwal
Jul 10, 20231 min read 7

A. Go to Company Setup. Go to PO Tab. Click on the edit option in the top right corner of the screen and search for the option “PO PDF GST % Visible?”. Enable it. GST% will be visible in PO PDF.

How to enable the description of the product to be visible in PO PDF?

Amit Barnwal
Jul 10, 20231 min read 12

A. Go to Company Setup. Go to PO Tab. Click on the edit option on the top right corner of the screen and search for the option “While Raising A PO Product Description Visible In PDF?

How you can restrict the PO approver/user to edit the option “Required by date” field by Level wise?

Amit Barnwal
Jul 09, 20231 min read 9

A. Here, Check box Level wise option as Level 1, Level 2 upto Level 11 has been provided to restrict the access of edit option. You can do the same following the enable option to edit the option “Required by Date” field by Level wise.

How to enable the edit the option “Required by date” field by Level wise PO approver?

Amit Barnwal
Jul 09, 20231 min read 7

A. For this, Go to Company Setup. Then go to PO Tab. Enable the edit option from the top right corner of the screen. Click on find and enable the options “Approver can edit required by date on level”.

Talk to us

Speak to us!

We are just a call away! Share your thoughts
Got a question

Puzzled! Ask Something?

We are ready to answer your queries
Ask Query

Still Confused in Selecting the Best!

Our experts are here to help you